A breakdown in the electrical supply between Valladolid-Campo Grande and the Canal del Duero junction is causing delays since early this morning on the high-speed line connecting Valladolid with Madrid.
As communicated by the Railway Infrastructure Administrator (Adif) through its official channels, information collected by Europa Press, the voltage has been progressively restored from the southern head and trains have been gradually normalizing their passage frequencies in both directions, although delays still persist.
Adif personnel continue working "to resolve the incident as soon as possible".
