Repsol takes Iberdrola, Naturgy and Endesa to court and demands 120 million from them for the blackout

The energy company demands compensation for the damage suffered in its five industrial complexes during the electrical shutdown of April 2025. The lawsuits also include Red Eléctrica, while the CNMC keeps open investigations into possible sector infringements

fotonoticia 20261030143248 1920

fotonoticia 20261030143248 1920

Add DEMÓCRATA to Google

Ask FREN

Published

2 minutes

Most read

Elecciones 29N · Encuestas

La media de las encuestas

Media a 16 de noviembre de 2026 · 16 institutos

  • PP31,4 %
  • PSOE27,1 %
  • Vox18,9 %
  • Frente Amplio6,4 %
  • ERC2,5 %
01020304050ene 2024jul 2024ene 2025jul 2025ene 2026jul 2026

Media del último estudio de cada instituto en 30 días y su evolución semanal desde el 23J. Partidos con al menos un 2 %.

Todas las encuestas

Elecciones generales del 29 de noviembre · Demócrata

ELECCIONES 29N

¿Cuál es tu pronóstico? 29N

Reparte los 350 escaños del Congreso como creas que quedarán el 29 de noviembre. Puedes cambiar tu pronóstico hasta que cierren los colegios.

0 de 350 escaños

PP
PSOE
Vox
Frente Amplio
ERC
Junts
EH Bildu
PNV
Más partidos
Podemos
BNG
SALF
CC
UPN
Adelante
Aliança
Otros

Protegido por reCAPTCHA de Google: privacidad y condiciones

Pronóstico de DemócrataParticipación abierta, no es una encuesta

Repsol has opened a legal front against the main Spanish electric utilities for the blackout of April 28, 2025. The company chaired by Antonio Brufau claims around 120 million euros from the distributors of Iberdrola, Naturgy and Endesa for the losses caused at its industrial facilities, in lawsuits filed in October and which also include Red Eléctrica as a subsidiary party responsible.

The claim affects five of Repsol’s main production centers, spread across different points in Spain. In La Coruña, the lawsuit is directed against the Naturgy-Fenosa distributor; in Bilbao and Cartagena, against Iberdrola; and in Tarragona and Puertollano, against Endesa. Each industrial complex has its own judicial procedure, although all share the origin of the damage in the widespread interruption of electrical supply that paralyzed industrial activity during the blackout.

The electric utilities will have to respond for the losses claimed

With the lawsuits already filed, Repsol seeks for the courts to determine who must assume the economic harm that it attributes to the supply failure. The company had previously tried to negotiate compensation with the distributors, but the talks ended without an agreement.

To do so, it turned to the Appropriate Means of Dispute Resolution (MASC), the mechanism for out-of-court negotiation that, since April 2025, must be used in general before filing a civil lawsuit. Once that possibility was exhausted, the energy company decided to claim the corresponding indemnities in court for its facilities.

The CNMC also investigates Repsol for the blackout

This legal offensive coincides with the investigations opened by the National Commission on Markets and Competition (CNMC), the public body in charge of supervising the energy sector and sanctioning possible breaches of its regulation.

In April 2026, the regulator initiated sanctioning proceedings against various electric utility companies and Red Eléctrica for indications of infringement detected during the investigation into the blackout. This investigation would also affect Repsol Generación Eléctrica, along with other companies of Iberdrola, Naturgy and Endesa.

The CNMC attributed the incident to a multifactorial origin, after a succession of problems that progressively unbalanced the electrical system until it caused a collapse due to overvoltage. In the proceedings, possible breaches of regulations are examined, some corresponding to periods prior to the blackout, and their resolution will determine whether it is appropriate to impose sanctions.

The chief executive officer of Repsol, Jon Josu Imaz, had announced in February that the company was preparing claims for the damage it suffered. At the time, he explained that he would wait to learn the results of the regulator’s investigation before moving forward through the judicial route.