Hyatt will make the leap to mainland Spain with its sign “Destination by Hyatt” through Azurean Marbella, a five-star residential and hotel resort promoted by Azur Group in Benahavís (Málaga), which includes an investment of 100 million euros and the creation of 191 direct jobs.
The exclusive marketing of the project has been taken on by Engel & Völkers Marbella. The development will include 133 branded residences and 164 hotel rooms, all of them managed under the operating model of the American chain.
The opening is scheduled for 2029, after the laying of the first stone last November 19. With this complex, the company strengthens its presence in Spain beyond the Balearics, where it already operates 7Pines Resort Ibiza and Sarena de Muro Resort Mallorca.
Azurean Marbella will be built on a plot of 22,425 square meters, with 14,640 square meters constructed and 7,228 square meters for green areas. The plan includes one- and two-bedroom apartments, units with a private pool, and “Grand Penthouses” with three bedrooms.
The asset will operate under a hybrid model of ownership and hotel operation. Owners will be able to enjoy their home for up to eight weeks a year, divided between low, mid and high season. The rest of the time, the properties will be integrated into Hyatt’s hotel management program, participating in the results of operations, without any guaranteed profitability.
From Azur Group, its founder and CEO, Roberto Bergonzi, has highlighted that the concept combines private ownership with the services and management typical of a five-star hotel. In turn, the Deputy CEO, Alfredo Pérez García, has emphasized that this scheme makes it possible to maximize annual occupancy and improve the use of resources such as energy, water and waste compared with the traditional second-home model.
On the other hand, the general director of Engel & Völkers Marbella, Smadar Kahana, has stated that Hyatt’s backing and the option to delegate maintenance and monetize the stay fit the profile of the international buyer on the Costa del Sol, whose average length of stay at the destination rarely exceeds eight weeks a year.
In the construction scope, the complex will incorporate the industrialized Baupanel system, photovoltaic panels to cover part of the electricity demand, and a treatment plant to reuse wastewater for irrigation of the landscaped areas.