Navantia has culminated with a satisfactory result the Critical Design Review (CDR) of the new Combat Support Ship (BAC) it will build for the Navy at the shipyard in Ferrol (Galicia), a “milestone that confirms the maturity of the design and allows formal progress to the manufacturing and testing phase,” as the company itself has announced.
This future BAC will be an evolved version of the ‘Cantabria’ and of the AAOR ships already built at the Ferrol facilities for the Australian Navy, incorporating substantial improvements over those previous models.
Among the most relevant innovations, the reinforcement of its protection capabilities stands out, through point-defense systems and anti-drone capabilities (C-UAS) against unmanned aircraft, along with the option to operate, deploy, and sustain unmanned aerial, surface and submarine vehicles.
It will also integrate the Integrated Services System (SSI), a digital architecture that will link the crew with the ship’s different systems and spaces, increasing the levels of safety, operational effectiveness and onboard management.
Construction will be carried out at the new Digital Blocks Factory of the Ferrol shipyard, with keel laying scheduled for the second half of 2027 and delivery of the ship to the Navy planned for 2030. The program will also represent an “important” boost for the national industry, since more than 300 Spanish companies will be involved and more than 1,800 direct and indirect jobs will be created over four years.