Tubacex, through the GNMS consortium, has secured a contract to supply pipes and components intended for Sizewell C, one of the largest new-generation nuclear projects in the United Kingdom, located in the county of Suffolk.
In a statement, the Basque company has detailed that the plant will feature two UK-EPR reactors, with a combined generation capacity of 3.2 GW.
Built on the technology and knowledge acquired during the development of Hinkley Point C, Sizewell C will help increase low-carbon electricity generation in the United Kingdom and strengthen its long-term energy security.
The scope assigned to Tubacex integrates the involvement of IBF in Italy and SBER in Austria, in addition to other collaborators within the GNMS consortium of which the company is part, bringing together highly specialized manufacturing capabilities under a coordinated industrial structure.
The GNMS consortium was created in 2014 by Tubacex with the aim of providing a joint response to the growing technical and management demands of major nuclear projects.
At present, thanks to the complementary capabilities of the companies that make up GNMS, the consortium is able to offer its customers an integrated tubular package that combines product supply, project management, supply chain coordination, and deliveries within the agreed deadlines.
This integration model enables GNMS to manage nuclear packages of great complexity with homogeneous execution and complete traceability, both operational and documentary, while meeting the strict quality standards of the nuclear industry.
Tubacex’s nuclear portfolio includes a "wide range of pipes for critical applications", including high-pressure steam piping systems and heat exchangers for the primary circuit, as well as the reactor control system.
All these systems are classified as safety-related components and have been designed to meet the requirements of new-generation nuclear technologies, including Small Modular Reactors (SMR).