Perhaps they do not form part of the best-known slogans of the campaign, nor are they among the cuts chosen by the televisions to summarize the rallies, but the digital electoral proposals of each party will be an item to take very much into account during the next four years. For this reason, we analyze in detail what the programs of the PSOE, the PP, Vox and the Frente Amplio contain on this topic.
Because in Spain, as pointed out by DigitalES (the association that represents the main technology and telecommunications companies), “it is necessary to convert the country’s leadership into connectivity as a real advantage for its competitiveness”. And to do so, they add, it is “a priority to guarantee a favorable environment for investment in advanced networks and digital infrastructures, simplify regulation, and move toward a genuine European single market for telecommunications that will allow gaining scale and investment capacity.
Likewise, the employers’ association recalls that “the development of artificial intelligence and other strategic technologies will require strengthening both connectivity and computing infrastructures, especially the data centers, for which it is essential to ensure access to energy and speed up administrative procedures”.
These priorities form part of its proposal for Digital Agenda 2030, with which the association calls for a vision for the country that places digital infrastructures as a driver of productivity, innovation and economic growth.
Deployment of fiber, 5G and future 6G networks
The PSOE is the party that includes the most concrete proposals in this area. It proposes a system of grants to the deployment of broadband on demand to close the remaining connectivity gaps, new programs to extend fiber and connectivity vouchers. It also proposes approving a 6G roadmap that includes pilot projects, actions on the radio spectrum and measures to prepare for the future deployment of this technology.
The PP limits its explicit proposal on mobile networks to the development and deployment of 5G on high-capacity routes. To that end, it advocates boosting investment in connected, sustainable and secure infrastructure. It does not specify specific measures to extend fiber and does not include references to 6G.
Vox incorporates telecommunications into its proposal to increase investment in infrastructures to connect the different territories, within a National Infrastructure Plan. However, it does not detail actions on fiber, 5G coverage, or preparations for 6G networks.
The Broad Front does not include specific measures on the deployment of fiber, 5G networks, or future 6G infrastructures.
Investment incentives and sustainability of the telecommunications sector
None of the four programs develops a specific package of investment incentives aimed at the telecommunications sector nor does it propose concrete measures to improve its economic sustainability.
The PP does mention the push for investments in connected infrastructures to encourage the deployment of 5G on high-capacity routes, while Vox considers it appropriate to increase general investment in infrastructures, including telecommunications. However, they do not specify financial or tax instruments aimed at operators.
The PSOE includes aid for the deployment of broadband and fiber, but it does not develop specific incentives for private investment in networks or measures on the sector’s sustainability.
The Broad Front also does not propose incentives for investment in telecommunications networks.
Computing infrastructures, data centers, and access to energy
The Broad Front develops the most detailed approach to data centers. It proposes considering them as national strategic infrastructure and directing their rollout according to their socioeconomic impact and the availability of resources, in addition to establishing that their ownership and governance remain under national or European control.
In energy matters, it requires that the electricity consumption of the new facilities be backed by additional renewable generation, to prohibit water-based cooling in river basins in a state of drought, to require the use of regenerated or desalinated water, and to establish the obligation to make use of waste heat: 10% in July 2026, with an increase to 20% in 2028. Added to this is a tax measure related to data centers: creating a levy on the economic activity of digital services linked to these facilities, called the “cloud tax”, and earmarking part of the revenue for the municipalities and regions that host them.
The PP would anticipate the electrical capacity needed to meet the demands of industrial, logistics and technological zones, as well as homes and data centers. Its commitment is to solve, within 18 months, through a shock plan, the problems that hold back the connection of these projects to the electrical grid. In addition, it bets on making better use of existing networks and improving electrical connections with the rest of Europe.
The PSOE includes a specific reference to the operating conditions of data centers: that they operate with renewable energy, reuse heat and make responsible use of water to minimize their environmental impact. It does not specify measures to speed up their connection to the electrical grid or accelerate the processing of new installations.
Vox does not include exclusive proposals on data centers, computing infrastructures, or these installations’ access to the electrical grid. Its reference to telecommunications is part of its broader investment approach for infrastructure.
European single market for telecommunications
Once again, there are no specific proposals to move toward a European single market for telecommunications nor concrete measures on the integration of national markets, the conditions for cross-border operation, or sectoral harmonization.
The most notable point is that the Frente Amplio advocates for Spain’s incorporation into the European consortium of digital common goods (Digital Commons EDIC), aimed at the development and joint financing of free software and shared digital infrastructures.