New Topo of San Sebastián: stations and connections to get to La Concha

The new railway intern opens this November 21 with three underground stations, trains every 7.5 minutes on the central section, and a stop a few meters from La Concha beach.

Add DEMÓCRATA to Google

Ask FREN

Published

Last updated

4 minutes

Most read

Elecciones 29N · Encuestas

La media de las encuestas

Media a 21 de noviembre de 2026 · 19 institutos

  • PP30,9 %
  • PSOE27,9 %
  • Vox19,0 %
  • Frente Amplio6,3 %
  • ERC2,6 %
01020304050ene 2024jul 2024ene 2025jul 2025ene 2026jul 2026

Media del último estudio de cada instituto en 30 días y su evolución semanal desde el 23J. Partidos con al menos un 2 %.

Todas las encuestas

Elecciones generales del 29 de noviembre · Demócrata

The new Topo of San Sebastián has already been in service since this Saturday, 21 November. The opening of a 4.2-kilometer rail through-passage under the city incorporates three underground stations and makes it possible to cross Donostia without making the turnaround change that until now conditioned the routes in Amara. The main novelty for travelers is the train’s arrival at the center and the surroundings of La Concha, as well as the improvement of service frequencies on the stretch between Añorga and Pasaia.

The infrastructure, executed by Euskal Trenbide Sarea (ETS) and financed by the Basque Government, connects the neighborhoods of El Antiguo, Centro, and Amara with the rest of the Euskotren network. The new route also makes it easier to travel between different municipalities in Gipuzkoa and eliminates transfers that until now were necessary on some itineraries.

What are the three new stations of the Topo?

The new through-passage incorporates three buried stations that make it possible to bring the train closer to key points in San Sebastián:

  • Bentaberri: provides service to the neighborhood of El Antiguo and improves access to the university area and other facilities in the surrounding area.

  • Kontxa-Zentroa: is the new station in the city center and the one closest to La Concha beach. Its access is located in the area around Easo Street and allows one to reach the beach on foot in a few minutes.

  • Amara: the new underground station progressively replaces the surface operation of the traditional terminal and allows continuity of the rail route toward the east and the west.

The underground stretch is 4.2 kilometers long. The Kontxa-Zentroa station is located at a depth of about 40 meters, while the alignment approaches the area of La Concha beach, one of the points of greatest interest for those who visit the city.

How to get to La Concha by train

The new Kontxa-Zentroa station is the main reference point for those who want to access La Concha beach using Euskotren. The Topo allows passengers to get off in the center of San Sebastián and continue on foot toward the promenade, without needing to reach Amara and then move afterward on another means of transport.

The station has access from the area around Easo Street and is designed to make entry and exit easier for travelers, with elevators and a connection between the different levels.

The opening also benefits those who travel to the city center for work, educational, or administrative reasons, by bringing the railway closer to areas that until now required walking more from the existing stations.

How often do the trains run and what frequencies will there be

One of the main improvements of the new Topo is the increase in frequencies. On the shared section between Añorga and Pasaia, which includes eleven stations, trains will run every 7.5 minutes during working days.

The new schedule includes 276 daily services from Monday to Friday. Metro frequency is thus extended to the western part of Donostialdea, with an improvement in services that connect different neighborhoods of San Sebastián and nearby localities.

The frequency will not be identical on all routes or in all time bands. Lines E1, T0 and T1 are reorganized to provide more continuous connections and reduce waiting times on the central section. On Sunday mornings, there will be longer intervals on some services.

Full timetables can be consulted on the official Euskotren website, where departures are detailed by line, station, day, and destination.

Which connections improve and what changes for travelers

The removal of the dead-end at Amara allows trains to continue their journey to the east or the west without ending the trip there and having to reorganize traffic. This makes direct connections easier between areas of Gipuzkoa that previously required transfers on certain itineraries.

Among the planned improvements are the routes from Lasarte-Oria, Zumaia, or the Bilbao area to Pasaia, Irun and Hendaia, as well as greater continuity in travel throughout Donostialdea.

Service will also be reinforced during weekends. Some routes will double their frequencies and the Saturday night service between Lasarte-Oria and Hendaia will have trains every 30 minutes, compared with the broader intervals that were applied previously in winter.

The platform change you need to take into account

The commissioning of the new alignment also implies a change in the direction of train traffic. Starting this Saturday, the Topo will run on the left between Lasarte-Oria and Hendaia, unifying the direction of travel of the network.

This change affects several stations on the section between Pasaia and Anoeta, where travelers will have to use the opposite platform to the one they used until now to catch their usual train. Euskotren has planned to modify the signage to inform users.

Therefore, those who use the Topo this Saturday for the first time or have a regular trip through those stations must check the signs and directions before accessing the platform.

Schedules, fares and route lookup

The launch of the new Topo in itself does not imply a general fare change announced in connection with the opening. Travelers can check the current prices, transport tickets and the conditions of each route through Euskotren’s official channels.

To plan a trip, especially during the first days of operation, it is advisable to check both the schedule of the origin station and the final destination, since the reorganization of lines changes the routes and the connections of some trains.

The new through-running service aims to make the Topo a faster and more frequent alternative for getting around San Sebastián and its metropolitan area, bringing the railway closer to the city center, to the beach and to neighborhoods that until now had less direct access to the service.