Almería activates the red alert for rains and sends an ES-Alert to mobile phones due to the risk of floods

The Junta de Andalucía elevates to emergency phase the Plan against the Risk of Floods and warns of precipitation of up to 60 liters per square meter in one hour in the Almeriense West and the capital.

EuropaPress 7382454 lluvia protagonista jornada hoy 20 marzo desdibuja entrada primavera

EuropaPress 7382454 lluvia protagonista jornada hoy 20 marzo desdibuja entrada primavera

Add DEMÓCRATA to Google

Ask FREN

Published

Last updated

3 minutes

Most read

Elecciones 29N · Encuestas

La media de las encuestas

Media a 15 de noviembre de 2026 · 16 institutos

  • PP31,4 %
  • PSOE26,9 %
  • Vox19,0 %
  • Frente Amplio6,2 %
  • ERC2,5 %
01020304050ene 2024jul 2024ene 2025jul 2025ene 2026jul 2026

Media del último estudio de cada instituto en 30 días y su evolución semanal desde el 23J. Partidos con al menos un 2 %.

Todas las encuestas

Elecciones generales del 29 de noviembre · Demócrata

ELECCIONES 29N

¿Cuál es tu pronóstico? 29N

Reparte los 350 escaños del Congreso como creas que quedarán el 29 de noviembre. Puedes cambiar tu pronóstico hasta que cierren los colegios.

0 de 350 escaños

PP
PSOE
Vox
Frente Amplio
ERC
Junts
EH Bildu
PNV
Más partidos
Podemos
BNG
SALF
CC
UPN
Adelante
Aliança
Otros

Protegido por reCAPTCHA de Google: privacidad y condiciones

Pronóstico de DemócrataParticipación abierta, no es una encuesta

The Emergency Agency of Andalusia (EMA) has sent this Saturday, October 17, a message ES-Alert to the mobile phones of the residents of Poniente almeriense and Almería capital due to the risk of torrential rains associated with the DANA Adam. The State Meteorological Agency (Aemet) has activated the red alert in the area near El Ejido, with forecasts of up to 60 liters per square meter in one hour.

The first vice president of the Junta and counselor of Presidency, Health, and Emergencies, Antonio Sanz, has announced that the Emergency Plan for Flood Risk in Andalusia has been raised to emergency phase, operational situation 1. The regional government asks to take extreme precautions and avoid any movement that may be dangerous.

"We have sent an ES-Alert message to the residents of the municipalities affected by the intense rains in the province of Almería. Maximum caution!" Sanz has stated through his social networks.

The Andalusian emergency official has insisted on the need to avoid flood-prone areas: "There is a red alert. Please, let no one cross channels or flooded areas. Be very careful and let's keep our guard up".

El Ejido, under red alert for torrential rains

Aemet has established the red alert until 5:00 PM this Saturday in the area of El Ejido, where precipitation can reach 60 liters per square meter in one hour. The red level represents the highest degree of danger contemplated in the meteorological warning system.

The rains have already left significant accumulations in the Poniente almeriense. According to data from the Southeast Meteorological Network (Ametse), collected by La Voz de Almería, El Ejido has exceeded 75 liters per square meter during the day.

Once the initially planned period for the red alert has ended, the area will remain under orange alert until midnight, according to the meteorological information released during the afternoon.

Orange and yellow alerts in the rest of Almería

The episode of rains associated with the dana Adam also affects other regions of the province. Aemet maintains the orange alert in the Poniente, the Levante almeriense, and Almería capital, with forecasts of up to 100 liters per square meter in twelve hours and 30 liters in one hour.

For its part, the Valle del Almanzora, Los Vélez, Nacimiento, and Campo de Tabernas are under yellow alerts for rains and storms, which could be accompanied by hail. In these areas, accumulations of up to 20 liters per square meter in one hour are expected.

The precipitation has begun to be recorded in different points of the province since the early hours of the day, although its intensity varies considerably between municipalities.

Emergencies urges not to cross flooded streams or roads

The Junta de Andalucía recommends avoiding unnecessary travel and not crossing roads, dry riverbeds, streams, or flooded channels, even if the water level appears to be low.

The Emergency Agency warns that the channels can experience sudden rises and reminds that it is also not safe to park vehicles or remain nearby during an episode of intense rains.

In case water begins to enter a home, it is recommended to seek upper floors and avoid basements and garages. The population must follow the instructions of the authorities and stay informed through official channels.

The ES-Alert system allows sending Civil Protection warnings directly to mobile phones located in a specific area, without the need to install an application. The messages include recommendations to reduce exposure to danger.

In any emergency situation, the Board reminds that one must call 112 Andalucía, available free of charge 24 hours a day.

More key points, information and questions with FREN

AI-GENERATED CONTENT

What steps must the Junta de Andalucía follow to lower the emergency level after an episode of torrential rains?

The Junta de Andalucía must assess the evolution of the risk and expressly agree on the change of situation or phase of the activated emergency plan. The cessation of rain does not automatically reduce the emergency level: the decision corresponds to the competent management and must be communicated to the intervening bodies and the population.

The procedure depends on the activated plan. The Law 2/2002 on Emergency Management refers to the procedure of each plan. The Decree 69/2024 and the PTEAnd, Territorial Emergency Plan of Civil Protection of Andalusia, establish the general framework and apply subsidiarily to aspects not foreseen in special plans.

1. Assess whether it is appropriate to reduce the response

The Emergency Management must keep the Plan Management informed about the evolution of the episode and propose the change of phase or situation, or deactivation. It has scientific-technical support from the Operations Committee and advice from the Advisory Committee.

The assessment must consider the risk and the intervention needs that persist, not only the end of precipitation. The PTEAnd maintains the emergency phase until the necessary measures to assist and protect people and property have been implemented.

2. Choose the appropriate situation
  • Move from situation 2 to situation 1: appropriate when the emergency can be controlled with ordinary means of the Junta or occasional supports that do not require specific coordination of the central bodies of the National Civil Protection System.
  • Move to pre-emergency: involves maintaining monitoring, information, and, when appropriate, alert or preventive mobilization, according to the applicable plan.
  • Move to recovery: allows maintaining coordination when there are significant deficiencies in essential services that prevent returning to normal life.
  • Deactivate the plan: requires analyzing the evolution of the situation and the causes that motivated its activation.
3. Adopt and record the decision

In the PTEAnd, the Plan Management ordinarily corresponds to the head of the department competent in civil protection. Section 4.1.2 expressly attributes to them: "Declare the possible change of phase and/or situation and deactivate the Plan depending on the evolution of events."

The declaration is made by that management or, by their order, by the Emergency Management, through a recorded telephone call via CECEM 112 Andalucía. By force majeure, another means that leaves reliable evidence may be used. This is the mechanism provided both to change phase or situation and to deactivate.

4. Communicate the change and maintain coordination

The Operational Coordination Center must communicate it to the authorities, bodies, and services involved and make communications to the National Emergency Monitoring and Coordination Center. If it is not constituted, these functions correspond to CECEM 112 Andalucía. The Plan Management also coordinates official information to the population through the Information Office.

5. Resolve special cases and recovery

If a general interest emergency of Andalusia was declared, its termination requires agreement of the Government Council, at the proposal of the competent department. Afterwards, the Crisis Office changes the phase or situation, or deactivates the plan; the Presidency decides its dismissal.

If recovery continues, the Executive Management coordinates the restoration of basic services. After deactivating the PTEAnd, an evaluation report on management must be prepared to improve future actions.

What are the competencies of the First Vice President of the Junta de Andalucía in emergency matters?

The First Vice President of the Junta de Andalucía has competencies of direction and coordination of emergencies and civil protection due to their simultaneous position as head of the Department of Presidency, Health, and Emergencies. It is not limited to a political coordination function: they are responsible for directing the Territorial Emergency Plan of Civil Protection of Andalusia, within the limits and substitution mechanisms provided in that plan.

Where their competencies come from

The Presidential Decree 9/2026, of July 9, expressly links the First Vice Presidency to the headship of that Department. Its article 3.1.d attributes to it the matters of "Emergencies and civil protection; the fight against environmental emergencies caused by forest fires," without prejudice to the competencies of other Junta bodies.

The distinction is important: these sectoral attributions correspond to the Department they lead, not exclusively to the rank of vice president. Additionally, the decree keeps the Andalusian Emergency Agency and the Government Delegations of the Junta attached to that department.

What decisions they can make in an emergency

Section 4.1 of the Territorial Plan, approved by Decree 69/2024, establishes that its direction corresponds to the head of the department competent in civil protection. In that capacity, their main powers are:

  • Activate and deactivate the plan, as well as declare changes of phase or situation as the emergency evolves.
  • Direct and coordinate actions to control the situation, activating the necessary mechanisms and procedures.
  • Convene the Advisory Committee and the Information Office, and appoint the members corresponding to them of the bodies foreseen in the plan.
  • Determine and coordinate information to the affected population, the media, and administrations, through the Information Office.
  • Request extraordinary means and resources from the State and other autonomous communities, and coordinate information and actions with the authorities involved.
  • Promote the implementation, maintenance, and review of the plan, and propose regulatory measures.
How operational management is articulated

Senior direction does not mean personally executing interventions. The Agency Statutes, approved by Decree 270/2024, assign to it the coordination, management, and technical execution of the regional operation under a single command. It integrates civil protection services, the 112-Andalusia Emergency Coordination Center, and the INFOCA operation.

The Agency develops preventive and operational planning, coordinates the public and private bodies involved, and provides technical, logistical, and training support. Therefore, a distinction must be made between plan direction and the technical responsibilities of the mobilized services.

Limits and changes in direction

The vice president can propose to the Government Council the declaration of general interest emergency of Andalusia, but cannot declare it alone. They can also request the president of the Junta to convene the Crisis Office. When this meets, it assumes the direction of the plan and is chaired by the president, who can also directly assume that direction when deemed appropriate.

Provincial executive direction corresponds to the Government Delegate of the Junta in the affected province. Likewise, the Law 2/2002 maintains the mayor as the highest municipal civil protection authority. If a national interest declaration is necessary, the plan direction requests it from the State; once declared, state regulations apply.

What legal requirements must be met to activate the ES-Alert national warning system in Spain?

To activate ES-Alert, there must be a risk or emergency that justifies urgently warning the population, and the sending must be decided by the competent civil protection authority according to the applicable plan and procedure. It does not generally require prior authorization from the central Government nor a declaration of national interest emergency. It is advisable to distinguish the legal obligations of the system from the operational steps to prepare and validate each message.

1. Legal basis and situation justifying the warning

Article 75 of the Law 11/2022, General Telecommunications Law, obliges mobile operators to transmit public alerts "in cases of major disasters or imminent or ongoing emergencies" to affected users. It also requires that they can be easily received and that their transmission is free both for recipients and the issuing entity. This framework responds to article 110 of Directive (EU) 2018/1972.

Therefore, it is not necessary to wait for damages to occur: it is possible to alert in the face of an imminent emergency. Operationally, the system is used when it is necessary for the population to adopt immediate self-protection measures, such as avoiding travel, sheltering, or evacuating. The Junta de Andalucía explains this criterion as the need to act to avoid or minimize imminent risks.

2. Decision of the competent authority

Articles 12 and 18 of the Law 17/2015, on Civil Protection assign to the Ministry of the Interior, through the National Emergency Monitoring and Coordination Center —CENEM—, the management of the National Alert Network, without prejudice to autonomous competencies. Autonomous centers are channels to communicate emergencies and transmit alerts.

In an emergency of autonomous competence, approval corresponds to the authority determined by its organization and the applicable plan; it does not require prior state validation. The Community of Madrid identifies the plan director as responsible for approving warnings. There are particularities: nuclear risk plans are state-level; Interior documents sending from CENEM, at the request of the Government Subdelegation, in the Trillo drill.

3. Preparation and validation of the message

The sending must fit within the direction, information, and coordination mechanisms of the corresponding plan. Article 10.3 of Law 17/2015 requires plans to include preventive communication and alert programs. In the operational application of ES-Alert, the following must be specified:

  • The risk and need for the warning: what is happening or expected and what protective action is required.
  • The geographic and temporal scope: the recipient area and message validity.
  • The content: emergency, affected area, clear instructions, and issuing body.
  • The authorization: intervention of previously authorized personnel. The operation described by Civil Protection differentiates between who drafts and who validates and authorizes, as noted by Demócrata.
4. What does not constitute a general requirement

A red warning from AEMET is not a nationally indispensable legal condition, nor do all meteorological warnings automatically generate an ES-Alert. AEMET provides information; Civil Protection decides the sending. There may be autonomous protocols with specific criteria, but these should not be confused with a uniform rule for Spain, as explained by Demócrata.

Individual consent of the receiver is also not required: dissemination by cells does not need to know their phone number nor collect their personal data. In summary, what matters is justified risk, competent authority, and authorized, delimited, and useful message, not a central authorization for each autonomous sending.

Play

Test your knowledge with FREN!

How much do you know about this topic? Answer the following 3 questions.

What type of weather warning has Aemet activated in El Ejido due to the Adam DANA?

Question 1 of 3

What system has been used to send Civil Protection warnings to mobile phones in Almería?

Question 2 of 3

What is one of the main recommendations from authorities regarding the risk of flooding in the province of Almería?

Question 3 of 3